Centre Pivot Window GGU 0068

Ratings
Brand: Velux
What you get
  • Wooden-polyurethane, top opening
  • Triple glazed unit with toughened and laminated glass P2A
  • Super energy-saving pane
View specification
Lead time: up to 8 weeks Find out more

Guarantee included at purchase Find out more

Specifications

BrandVelux
U-value1.1

Rotary window made in the technology of a wooden core covered with pressure-coated polyurethane, in white. Top handle, air vent and air filter. Thanks to the use of ThermoTechnologyTM with high-temperature treatment of wood used for the production of the core, the wood is more durable and stable, and the windows have even better insulation parameters. Recommendations for use: rooms with increased humidity (bathrooms, laundries, kitchens).The windows are marked by VELUX with the Premium class.

GGU 0068 – benefits:

 

Available window sizes (cm): 

 

Important note:

It’s necessary to choose a sealing flashing for window, which is an essential element when you install the roof window. The flashing is selected depending on the roofing (e.g. roof tile type, thatch tile, steel tile, shingle, roofing felt etc.) and roof pitch. Flashing is used to seal the window and drain water and snow beyond its outline.

In case of installing the windows without standard flashing, it’s necessary to order the ZWC flashing.

In addition, you can choose accessories such as:

Files to download

Recently viewed products

Our realizations

VELUX roof windows | Co. Galway | #80

How it works

Asking for a quote
Number One

Asking for a quote

Press ‘Get a quote’ button and submit your enquiry with the chosen joinery parameters.

Receiving the quote
Number Two

Receiving the quote

Our sales team will return to you with the purchase quote on joinery, delivery/installation costs and the lead time.

Verification
Number Three

Verification

Our employee will go through all the information included in the offer together with you.

Agreement and Payment
Number Four

Agreement & Payment

It is the stage where we confirm the contract and you make the payment.

Production
Number Five

Production

It’s the time it takes to produce your ordered joinery.

Delivery
Number Six

Delivery

This is the shipment period for your ordered products.

Installation
Number Seven

Installation

If you’re interested in our installation services, we agree on the dates individually.

Comparison
Remove all
Compare products